MEAI provides our clients with expeditious, creative and best-in-class site development services. MEAI partners with our clients and develops well planned solutions on each individual project by utilizing specialized civil engineering including retail, industrial, corporate office, faith/worship and urban development projects. Clients benefit from our assistance in enhancing their real estate value through effective site programming which incorporates their vision and project goals.MEAI utilizes effective integration and strategic alignment of our diversification of "one-stop" services spanning a wide range. This integration ensures consistent project performance and experience throughout all phases of the civil engineering requirements, from inception of the project through completion of construction. MEAI services for Site, Grading, Drainage, and Utility Plans include:
Surveying
Site Planning and Approval Applications
Water and Wastewater Design
Grading & Drainage Design
Landscape and Irrigation Design
Construction Staking
Special Inspections
Materials Testing
Asbuilt Plan Preparation
Post Design Support and Project Closeout
Project and Client Examples Include:
Hilltop Booster Station
(Kingman, AZ) Water booster system to extend City of Kingman Hilltop Pressure zone for new and future development. Part of required construction for new Hualapai Mountain Medical Center. Plans and specifications included:
Pump and mechanical control specifications
(2) Goulds 14RHMC 3-stage vertical turbine pumps with 150 hp motors
(2) Cans for future pumps
1600 AMP Manual Transfer Switch
New Generator
Site Improvements – Connection to existing 1.5M gallon storage tank
7,862 L.F. waterline extension
Mohave Community College
(Bullhead City, AZ) Replace existing waterline serving Bullhead City campus with new 10" and 8"waterlines to achieve pressures adequate for fireflows and future construction. Key considerations included:
Modeling the pressure scenarios for a new 10" backflow preventor and pressure release valve
Providing detailed construction drawings to accommodate existing site improvements
Obtaining ADEQ system approval
Providing a detailed inventory of waterline appurtenances and construction costs for client budgetary requiements.
MEAI also provided construction staking and material testing. The project was successfully completed in June, 2012.
Mt.Tipton Water System
(Dolan Springs, AZ) Prepare site improvement plan and well construction details to obtain ADEQ Discharge Authorization and Approval of Construction for Mt. Tipton Water System to replace existing well.
Valley Pioneers Water Company
(Golden Valley, AZ) Provide design survey, construction details and specifications, construction staking, and inspections for approx. 1,300 new 6" waterline. Project required ADEQ Approval to Construct and Approval of construction. Project was successfully completed in June, 2012.
Civil Engineering, Construction Engineering, surveying , survey, surveyor, land surveyor