Water Distribution

 Since 1987 MEAI has designed and overseen the construction of numerous water systems, extensions and improvement projects in Kingman and the Mohave County area.No matter how big or small your water system project is, MEAI's staff will be involved in all aspects. We have the procedural knowledge, technical expertise, and the technology necessary to make your project a success.MEAI's project portfolio for water distribution ranges from small waterline extensions for residential use to complex, high pressure systems serving industrial uses and spanning many miles.MEAI specializes in the following areas of water distribution:

Hydraulic Modeling and Design

Scenario Analysis

Wellsite and Pump Design

Feasibility Studies

Cost Analysis

Water Quality Testing

Construction Quality Control

Distribution System Design and Construction


Project and Client Examples Include:

Hilltop Booster Station



(Kingman, AZ) Water booster system to extend City of Kingman Hilltop Pressure zone for new and future development. Part of required construction for new Hualapai Mountain Medical Center. Plans and specifications included:

Pump and mechanical control specifications

(2) Goulds 14RHMC 3-stage vertical turbine pumps with 150 hp motors

(2) Cans for future pumps

1600 AMP Manual Transfer Switch

New Generator

Site Improvements – Connection to existing 1.5M gallon storage tank

7,862 L.F. waterline extension


Mohave Community College



(Bullhead City, AZ) Replace existing waterline serving Bullhead City campus with new 10" and 8"waterlines to achieve pressures adequate for fireflows and future construction. Key considerations included:

Modeling the pressure scenarios for a new 10" backflow preventor and pressure release valve

Providing detailed construction drawings to accommodate existing site improvements

Obtaining ADEQ system approval

Providing a detailed inventory of waterline appurtenances and construction costs for client budgetary requiements.


MEAI also provided construction staking and material testing. The project was successfully completed in June, 2012.

Mt.Tipton Water System



(Dolan Springs, AZ) Prepare site improvement plan and well construction details to obtain ADEQ Discharge Authorization and Approval of Construction for Mt. Tipton Water System to replace existing well.

Valley Pioneers Water Company



(Golden Valley, AZ) Provide design survey, construction details and specifications, construction staking, and inspections for approx. 1,300 new 6" waterline. Project required ADEQ Approval to Construct and Approval of construction. Project was successfully completed in June, 2012. 

Construction Engineering , Land Surveyor